EMAS Lewek FPSO for offshore Vietnam.
Case study
Significant EPC contract for the crude stabilisation, water injection and flare modules. DPS were also responsible for the overall process topsides interface engineering.

FPSO: Chim Sao Dua
Client: EMAS / Premier Oil
Location: Offshore Vietnam
FPSO Capacity: 80,000bpd, 50mmscfd
This was another significant EPC contract for the crude stabilisation, water injection and flare modules onboard the EMAS FPSO. In addition, DPS were also responsible for the overall process topsides interface engineering. This project was won as part of a EMAS/DPS consortium following an intensive 12 (twelve) week design competition.